CPA Bespoke Joinery is an established operation that oversees joinery projects from consultation all the way through to aftercare.
Table of Contents
Background of the Case Study
Established in 2002, CPA Bespoke Joinery is an established operation that oversees joinery projects from consultation all the way through to aftercare. CPA takes a great amount of pride in their work which, when combined with their top manufacturing facility, creates a recipe for success utilising a variety of materials such as solid timber, panel products, glass acrylics and many more.
CPA enlisted RPMG Global for extensive building maintenance at The Sidings, Units 1-3, and additional units housing a McDonald’s delivery kitchen. Demonstrating the busy working environment RPMG worked within. Furthermore, as a result of the additional units hosting live kitchens, it was paramount that hygiene was a top priority.
Completed Works
RPMG’s scope of work included:
Dilapidation Works: RPMG Global meticulously executed dilapidation works, ensuring compliance with lease conditions and industry standards, and facilitating a seamless transition for the property.
Gutter Cleaning: The team conducted thorough gutter cleaning, contributing to the structural preservation of The Sidings by preventing blockages and water-related damage.
Cut-Edge Corrosion Treatment: Addressing cut-edge corrosion was a priority, safeguarding the longevity of the property and ensuring the structural integrity of the roofing system.
Restoration of Trapezoidal Composite Wall Panels: Precision in the restoration of Trapezoidal composite wall panels not only maintained structural integrity but also contributed to the visual enhancement of The Sidings.
Specialist Cleaning of Building Fabric and Internal Liner Panels: The building fabric and internal liner panels underwent specialist cleaning, enhancing both aesthetics and hygiene; contributing to the overall maintenance of the property.
What challenges did we face and overcome?
Live Construction Environment
The works were conducted in a live construction environment, necessitating coordination with other trades and navigating potential disruptions.
Winter Weather Conditions
Adverse winter weather conditions added an element of complexity to the maintenance activities.
Short Programme of Works
A limited timeframe required efficient planning and execution of the comprehensive maintenance tasks.
Colour Matching
Precision was crucial in matching existing colours during the restoration of Trapezoidal composite wall panels.
Fall Protection Equipment
Due to other ongoing works, 18mm Structural Boards were required for fall protection.
Why were RPMG's services essential?
Dilapidation Compliance
Ensuring compliance with lease conditions and industry standards for the entire property..
Structural Preservation
Gutter cleaning, cut-edge corrosion treatment, and panel restoration contributed to the structural preservation of The Sidings.
Aesthetics Enhancement
The restoration of Trapezoidal composite wall panels and specialist cleaning enhanced the overall aesthetic appeal.
What were the outcomes for CPA Joinery?
Lease Compliance
Dilapidation works ensured compliance with lease conditions, facilitating a smooth transition for the property.
Structural Preservation
Gutter cleaning, cut-edge corrosion treatment, and panel restoration preserved the structural integrity of The Sidings.
Colour-Matched Restoration
The Trapezoidal composite wall panel restoration was executed with precision, ensuring a seamless and visually pleasing result.
Fall Protection Implementation
RPMG Global efficiently addressed fall protection needs, incorporating 18mm Structural Boards into the project.
Efficient Co-ordination
The team's coordination with contracts and site management, along with a multi-disciplined approach, enabled a swift and cost-effective execution.
Contribution to the circular economy
By allowing RPMG to restore the trapezoidal wall cladding, CPA demonstrated their commitment to saving the planet by re-using older materials wherever possible; Reducing the waste produced from the completed works and contributing to the reduction of greenhouse emissions produced within industrial manufacturing processes.