RPMG Icon

Building Restoration Works - March 2023

CPA Bespoke Joinery is an established operation that oversees joinery projects from consultation all the way through to aftercare.

Table of Contents

Background of the Case Study

Established in 2002, CPA Bespoke Joinery is an established operation that oversees joinery projects from consultation all the way through to aftercare. CPA takes a great amount of pride in their work which, when combined with their top manufacturing facility, creates a recipe for success utilising a variety of materials such as solid timber, panel products, glass acrylics and many more.

 

CPA, renowned for its joinery expertise, enlisted RPMG Global for extensive building maintenance at Unit C3, Bootle. With a commitment to excellence, CPA specialises in joinery projects from consultation to aftercare, and their collaboration with RPMG aimed to uphold these standards.

CPA Joinery Work at Height Progress Picture

Completed Works

RPMG’s scope of work included:

Dilapidation Works: RPMG Global executed meticulous dilapidation works, ensuring compliance with lease conditions and industry standards for a seamless property transition.

Gutter Cleaning: Thorough gutter cleaning contributed to structural preservation at Unit C3, preventing blockages and potential water-related damage.

Cut-Edge Corrosion Treatment: Addressing cut-edge corrosion safeguarded the property’s longevity, ensuring the structural integrity of the roofing system.

Kingspan Rooflight Replacement: RPMG Global replaced Kingspan rooflights, enhancing natural light while meeting the project’s requirements.

Restoration of Composite Wall Panels and Trapezoidal Wall Cladding: Precision in restoring composite wall panels and Trapezoidal wall cladding maintained structural integrity and enhanced the visual appeal of Unit C3.

Specialist Cleaning of Building Fabric and Builders Clean: Specialist cleaning of the building fabric and a builder’s clean ensured a high standard of hygiene and aesthetics.

What challenges did we face and overcome?

Rooflight Installation for CPA Joinery
time
Short Timeline and Programme

The works were conducted in a live construction environment, necessitating coordination with other trades and navigating potential disruptions.

roof
Material Lead Times

Adverse winter weather conditions added an element of complexity to the maintenance activities.

time
Live Construction Environment

A limited timeframe required efficient planning and execution of the comprehensive maintenance tasks.

Winter Weather

Precision was crucial in matching existing colours during the restoration of Trapezoidal composite wall panels.

Pre-start Survey with Truck Mount Access

A prestart survey with Truck Mount Access was conducted to accelerate the ordering of rooflights, meeting the project's timeline.

Why were RPMG's services essential?

Dilapidation Compliance

Ensuring compliance with lease conditions and industry standards for the entire property.

Structural Preservation

Gutter cleaning, cut-edge corrosion treatment, and panel restoration contributed to preserving Unit C3's structural integrity.

Aesthetics Enhancement

The restoration of composite wall panels and Trapezoidal wall cladding enhanced the property's overall aesthetic appeal.

Interior Perspective of Roof Lights at CPA Joinery

What were the outcomes for CPA Joinery?

Lease Compliance

Dilapidation works ensured compliance, facilitating a smooth property transition.

Structural Preservation

Gutter cleaning, cut-edge corrosion treatment, and panel restoration preserved Unit C3's structural integrity.

roof

Material Lead Time Managment

The Trapezoidal composite wall panel restoration was executed with precision, ensuring a seamless and visually pleasing result.

Efficient Co-Ordination

The team's coordination with the commercial team and a multi-disciplined approach enabled swift execution with minimal disruption.

Contribution to the circular economy

By allowing RPMG to restore the composite wall panels and trapezoidal wall cladding, CPA demonstrated their commitment to saving the planet by re-using older materials wherever possible. Reducing the waste produced from the completed works and contributing to the reduction of greenhouse emissions produced within industrial manufacturing processes.

In this collaboration between CPA and RPMG Global, challenges were met with professionalism and adaptability, resulting in successful building maintenance at Unit C3, Bootle.
Remove the headache of building maintenance, get in touch with a member of our team and let us handle the rest.